Emergency force main repair work will begin on March 25, 2023 at Redwood Shores Parkway and Marlin Drive. There is a leak on SVCW’s main sewer pipeline and this work will allow crews to locate and repair the leak.
STATUS UPDATE (04/17/23): Great progress has been made on restoration work, which is expected to be complete later this week. The pipe is being tested for leakage and if the repair is successful, the excavation will be backfilled, followed by curb and gutter restoration and finally, paving and striping.
STATUS UPDATE (04/05/23): Installation of shoring and leak repair continues at the intersection of Redwood Shores Parkway and Marlin Drive (east corner).
TRAFFIC IMPACTS:
Redwood Shores Parkway Eastbound Lane Closure through Friday, April 7, 2023
Both eastbound lanes will be closed between Marlin Drive and Shell Parkway for shoring installation and excavation work from 7 a.m. to 7 p.m. daily through Friday, April 7. See below for detour route. Use alternate route (Marine Parkway) when possible and expect delays. Westbound lanes will remain open and bus services will not be impacted.
Redwood Shores Parkway (North/East Bound): Right land and bike lane closure; continuous throughout construction.
Marlin Drive (South): Limited access with one-lane traffic for both directions into the Marlin Drive Neighborhood. Expect delays and please exercise extra caution. Traffic control personnel (flaggers) will be on-site to direct traffic. Emergency access will be provided at all times. There are no interruptions to water and sewer services during construction.